FOR PROFESSIONAL USE ONLY
General Guidelines
- For interior applications only.
- Apply when substrate and ambient conditions are between 50ºF and 90ºF (10–32ºC) for 72 hours prior to installation, and maintain that range for 72 hours after.
- Platform FP is RH tolerant up to 100% and allows free passage of moisture vapor.
- Platform FP can be used to patch concrete prior to application of Platform EMS or other resinous coating systems.
- Moisture limits (RH or Moisture Vapor Emission Rate) are set by the finished flooring and its adhesive. When moisture emissions exceed the level permitted for the finished flooring, apply Platform EMS and Platform P360, then apply Platform FP or a Platform self-leveling underlayment.
- Concrete surface temperature must be at least 5ºF (3ºC) above the dew point prior to application.
- Not suitable over luan, plastic, fiberglass, metal, particle board, sheet vinyl, presswood, OSB, or non-APA (exterior) rated wood subject to movement or swelling.
- Do not install Platform FP over gypsum substrates without first priming with Platform P360 (see Gypsum Substrates below). For other gypsum patch and repair options, see Platform’s product line or contact Technical Services.
- Installation must conform to applicable local, state and federal building codes.
Moisture: Follow the flooring and adhesive manufacturers’ directions for maximum allowable moisture content (RH) or transmission of the substrate. If the moisture content (ASTM F2170) or moisture vapor emission rate (ASTM F1869) exceeds the flooring system’s requirements, use Platform EMS. Platform FP can be used to patch concrete before Platform EMS is applied. Platform FP will not inhibit transmission of moisture to the finished flooring.
All substrates must be sound, clean, dry and free of contaminants (oil, dirt, laitance, etc.) that may interfere with adhesion. Do not use solvents, acids or chemical adhesive removers. Remove all bond-breaking substances (cure residues, excess salts from silicates, etc.) prior to priming. Vacuum all dust and debris before applying material.
Honor all moving joints. Complete crack and substrate repairs prior to installation. Moving cracks or joints filled with Platform FP may reflect through the finished floor. Consult an engineer for required joints and crack repairs.
Maintain a minimum of 50ºF before, during and for 72 hours after installation. Acclimate the material to a minimum of 50ºF prior to mixing. If uncertain of suitability or bond, test an inconspicuous area first.
Surface Preparation
Concrete Floors: All concrete must be sound, stable, clean and free of bond-breaking materials (silicates, curing compounds, laitance, dirt). Mechanically remove weak surfaces and contaminants to sound concrete. Priming is not required. Apply from featheredge to ½" in depth.
Adhesive Residue: Scrape non-soluble adhesives to a well-bonded residue. Water-soluble and pressure-sensitive adhesives must be removed mechanically to the substrate. Verify adhesive type prior to mechanical removal so that asbestos-containing adhesive is not introduced into the environment, and follow all local, state and federal laws for its removal and disposal. Test to ensure existing adhesive will not bleed through to new adhesive or finished flooring. If the concrete under the adhesive is weak or poorly bonded, remove those areas down to a well-bonded, sound, clean substrate.
Wood: Platform FP is suitable for skimcoating well-bonded (screwed and glued), APA rated, exterior grade wood floors free of deflection. Wood floors must be a minimum of ¾", meet L/360 and comply with local building codes. No primer is required. Do not install over OSB, chipboard, Masonite, non-APA rated surfaces, or dimensionally unstable materials subject to swelling or movement.
Quarry & Ceramic Tile: Strip waxes or sealers from the tile surface. Abrade to a dull finish and vacuum. Consider Platform P360 primer for additional bond.
Gypsum Substrates: Before application over gypsum, apply two coats of Platform P360: the first diluted 3:1 (water:primer) and the second diluted 2:1 (water:primer). See the Platform P360 data sheet for details.
Vinyl Flooring: Platform FP is suitable as an embossing patch over vinyl flooring. Vinyl must be well bonded, dry, clean and free of bond-breaking materials (wax, coatings, laitance, dirt, etc.). Priming is usually not required, but consider Platform P360 for additional bond.
Non-Porous Substrates: Platform FP may be applied over resinous coatings free of amine blush, or over non-porous substrates including Platform EMS. Priming may not be necessary, but perform a bond test before proceeding. When improved bond is needed, apply Platform P360 NEAT with a ⅜" nap roller to a thin, shiny film with no puddling, and let it fully cure before applying Platform FP.
Mixing
Water: Up to 2.5 US qt per 10 lb bag, or mix by volume at 2 parts powder to 1 part water.
Mix Method: Always use a drill and mix until thoroughly homogenous and lump-free. Over-watering or under-mixing will make placement difficult and lower ultimate compressive strength.
Add clean, potable water to a clean mixing vessel, add the powder and mix mechanically until homogenous and lump-free. Mix no more material than can be placed within 10–15 minutes. Platform FP can be retempered without adding water to extend working time.
Material Application
Use a clean trowel or screed to place the material across the substrate. No minimum thickness is required. For deeper areas, allow the initial coat to reach partial set before building layers. Once dry, the material may be sanded to remove placement imperfections before installing the floor covering.
Dry Time Prior to Flooring Installation
Platform FP is self-drying. Do not wet cure or use curing or sealing compounds. Placement depth, temperature and humidity affect dry time. Material is typically dry in 30–45 minutes and ready for light sanding or direct application of flooring.
Storage: Store in cool, dry conditions out of direct sunlight, with pallets wrapped in original shrink wrap.
Clean-Up and Disposal: Wash hands and tools with water before the material hardens, or within 10 minutes of contact. Cured material must be removed mechanically. Dispose of waste in accordance with all local, state and federal regulations. Hardened material is generally considered construction waste.