General Guidelines
- Designed for application on dry, properly prepared interior substrates
- No mechanical preparation of concrete substrates is required on most applications
- Install between 50ºF and 90ºF, in enclosed, climate-controlled buildings
- Avoid regular trade traffic for 16–24 hours after application
- Not for use as a permanent wear surface, or as a substrate for an epoxy coating wear surface
- Installation must conform to applicable local, state and federal building codes
Reference the floor covering and adhesive manufacturers’ documentation to verify suitability of Platform NP as a subfloor for the flooring system. Any adhesive used for concrete is generally suitable for Platform NP. Follow the flooring and adhesive manufacturers’ directions for maximum allowable moisture content (RH) or transmission of the substrate. If the moisture content (ASTM F2170) or moisture vapor emission rate (ASTM F1869) exceeds the flooring system’s requirements, use Platform EMS 100% epoxy moisture vapor mitigation prior to installing Platform NP.
Honor all moving joints. Complete crack and substrate repairs prior to installation. Consult an engineer for required joints and crack repairs.
Maintain a minimum of 50ºF during the pour and for 72 hours after. Acclimate the material to a minimum of 50ºF prior to mixing. To maximize flowability and working time, use cool water when temperatures exceed 85ºF.
Radiant Heat: For installation over hydronic or electrical heating systems, use a minimum of ¼" of material above the surface of the heating system. Platform NP is compatible with and accepts direct application of urethane, moisture cure and other typical floor covering adhesives.
Depth and Extension: Platform NP can be applied in one lift to a maximum depth of 3" NEAT monolithically. In areas 3" to 6" deep, extend with clean, washed, SSD (saturated surface dry) ¼"–⅜" pea gravel, up to 50% by weight (25 lbs pea gravel per 50 lb bag). Ensure the pea gravel is thoroughly mixed in (encapsulated).
SURFACE PREPARATION
All substrates must be sound, clean, dry and free of contaminants (oil, dirt, laitance, etc.) that may interfere with adhesion. Areas of the floor that do not exhibit a tensile pull strength greater than 72 psi must be mechanically removed to a sound, stable base and repaired prior to application. Do not use solvents, acids or chemical adhesive removers. Remove all bond-breaking substances (cure residues, excess salts from silicates, etc.) prior to priming. Vacuum all dust and debris prior to priming with Platform P360.
Gypsum Substrates: Gypsum must exhibit a sound surface, free from dust and surface weakness, prior to priming.
Adhesive Residue: Scrape non-soluble adhesives to a well-bonded residue. Water-soluble and pressure-sensitive adhesives must be removed mechanically; contact Technical Services for details. Verify adhesive type prior to mechanical removal so that asbestos-containing adhesive is not introduced into the environment, and follow all local, state and federal laws for its removal and disposal. Platform NP is not a suitable means to encapsulate residue of hazardous materials.
Wood Substrates: Platform NP is suitable for use on APA approved, solid ¾" plywood in residential and light commercial applications without reinforcing lath. Wood substrates must satisfy local codes, with maximum joist spacing of 16"–19.2" OC, using Type 1 exterior grade plywood or equivalent OSB.
PRIMING
Prime properly prepared substrates with Platform P360 prior to applying Platform NP.
Non-Porous / Non-Absorbent Substrates (wood, adhesives, epoxy, epoxy terrazzo, some existing floor finishes): Single-coat prime NEAT (undiluted) with a ⅜" nap roller, without puddles.
Porous / Absorbent Substrates (gypsum underlayment, most concretes, other absorbent substrates): Dilute Platform P360, generally 3:1 (water:primer), and apply without puddles using a soft, fine-tipped broom. Follow with a second coat at 2:1 (water:primer).
Reference the Platform P360 data sheet for additional details.
Platform NP is very flowable and will flow through any exposed voids. Seal voids and penetrations with a rapid setting patch such as Platform FP or Platform GP, or with expanding foam. Platform NP has tremendous bonding properties. If preferred, install the Platform 3.5" EZ Perimeter Isolation Strip along walls and columns, and make sure metallic structures such as heating pipes are adequately protected.
MIXING
Water: 4.75–5.0 US qt (4.5–4.8 L) per 50 lb (22.7 kg) bag
Mix Time: 2–3 minutes with a 650+ rpm drill, or through a pump
Add water to a clean mixing barrel, add the powder, and drill-mix with the manufacturer-recommended paddle until smooth, homogenous and lump-free, with no unmixed material at the bottom. For barrel mixing or large mixing equipment, use the appropriate water-to-powder ratio. Keep the paddle below the surface to limit air entrainment, and pour immediately once mixed. Over-watering or under-mixing will lower ultimate compressive strength.
Pumping: Platform NP may be mixed and/or pumped with most standard batch or inline equipment. Contact Technical Services with pump questions.
APPLICATION
Immediately after mixing, pour Platform NP onto the substrate, rake to the required depth and smooth with appropriate tools (smoother and/or porcupine roller). Maintain a wet edge, always pouring back into the leading edge of the previous placement.
DRYING TIME
HVAC-controlled environments yield the most consistent results. After 4 hours, keep gentle air circulation to aid drying, but avoid direct airflow across the surface for 16–24 hours and direct sun during application and for 6 hours after placement. Platform NP generally accepts light foot traffic 2–3 hours after placement. Avoid construction traffic for a minimum of 16–24 hours (temperature dependent).
General drying guidelines at 70ºF with air circulation:
- Breathable flooring: Install after 16 hours at ¼" depth. Add 12 hours for every additional ¼".
- Non-breathable flooring: Install after 24 hours at ¼" depth. Add 16 hours for every additional ¼".
Temperature, humidity and airflow affect drying time. A moisture meter is recommended to verify readiness, surveying multiple areas. A Delmhorst G-79 reading of 5% moisture content or lower, or a GE® Protimeter Surveymaster or Aquant reading of 180 or lower in RF (Radio Frequency) mode, indicates suitable dryness for any floor covering.
CLEAN-UP AND DISPOSAL
Wash hands and tools with water before the material hardens, or within 10 minutes of contact. Cured material must be removed mechanically. Dispose of waste in accordance with all local, state and federal regulations. Hardened material is generally considered construction waste.
STORAGE
Store in cool, dry conditions out of direct sunlight, with pallets wrapped in original shrinkwrap.